Construction programme intelligence
FloatSight reads the programme your planner already issues and turns it into answers the whole team can act on: what should be built by any date, what changed in the latest revision, and where the warning signs are.
No card required. Unlimited projects on every paid plan.
The problem it solves
Programmes are hard to read for anyone who is not a planner
Project managers, commercial managers, client representatives and subcontractors often receive the programme only as a PDF.
Every revision changes something
Working out what moved, what was added and what was removed takes hours of side-by-side checking.
Under NEC4 and FIDIC the programme is a contract document
It comes with fixed response periods and notice deadlines. A missed reply or a late notice costs real money. In CECA's July 2024 survey, fewer than 30% of NEC projects had a programme accepted every period.
On site at this date: A1320 Frame, levels 3-4
Drag along the programme to move the date. Synthetic example programme.
Drag the reference date to see what the site should look like. Planned figures come from the programme dates; reported figures from recorded progress. FloatSight keeps the two apart and never calls an activity late without evidence.
What FloatSight does
Asta, P6, Microsoft Project, Excel and PDF. See what was read and what is missing before anything is saved.
An interactive Gantt, what should be done by any date, and an assistant that answers by citing the activities.
Revision against revision: dates moved, activities added or removed, milestones slipping.
Rule-based early warnings, lookaheads from 7 to 42 days and a risk register your team owns.
The programme and the Contractor's notices against the contract: NEC4 ECC, JCT 2016 and FIDIC 2017.
Reports, draft responses and Notices in Word, and Excel exports. It never sends anything on its own.
Four principles of trust
How it works
No re-keying and no template. Every upload is kept as an unchanged original.
Missing dates, duplicate IDs, circular logic and odd durations are flagged row by row. Fix or exclude them before anything is saved.
See what the programme says should be finished, in progress or starting soon - separately from what has actually been reported.
Ask questions in plain English, compare revisions activity by activity, and export a report for the client meeting.
Dates, counts and comparisons are calculated by the scheduling engine, not guessed by a language model. The assistant explains the result and shows you exactly which activities it used.
2 milestones are dated between 9 October 2026 and 23 October 2026:
Source: Rev 02 progress update, data date 2 October 2026.
Illustrative answer based on synthetic data.
Supported files
Native .mpp files and Primavera P6 XML are planned.
Principles